idw – Informationsdienst Wissenschaft

Nachrichten, Termine, Experten

Grafik: idw-Logo
Science Video Project
idw-Abo

idw-News App:

AppStore

Google Play Store



Instance:
Share on: 
06/14/2016 15:07

Fraunhofer IZFP inspects the deck slab of the Fechingen Viaduct

Sabine Poitevin-Burbes Presse und Öffentlichkeitsarbeit
Fraunhofer-Institut für Zerstörungsfreie Prüfverfahren IZFP

    In recent months, many Saarlander have suffered from the full closure of the Fechingen Viaduct that has plunged the traffic in the capital region into chaos. Due to expert assessments forecasting the risk of sudden failure of the bridge piers, the bridge had to be closed. In order to re-integrate this important infrastructure construction into the traffic network, at least in a restricted extent, it was necessary to reduce the load of the supporting structure.

    On behalf of the “Landesbetrieb für Straßenbau” (LfS – State Office for Road Construction) researchers and engineers of the Fraunhofer Institute for Nondestructive Testing IZFP checked the concrete roadway out: Due to Fraunhofer IZFP providing market-ready methods to detect critical changes within the structure of bridges and other infrastructure buildings in very early stages, the LfS had commissioned Fraunhofer IZFP to measure the concrete thickness of the deck slab. "Our task was to perform random measurements by ultrasonic echo method on a specified reference surface of the Fechingen Viaduct to determine the exact concrete thickness," explains Prof. Ute Rabe, responsible group leader of Fraunhofer IZFP’s “In-Service Inspection and Life-Cycle Monitoring” department. After the successful completion of the measurements the obtained results now serve as comparative values for additional large-scale surveys of the bridge structure and for lasting optimization of the future bridge safety.


    More information:

    http://www.izfp.fraunhofer.de/en.html


    Images

    Bridge works, Fechingen Viaduct
    Bridge works, Fechingen Viaduct
    Source: Kondephy, wikipedia


    Criteria of this press release:
    Journalists, all interested persons
    Construction / architecture, Materials sciences, Traffic / transport
    transregional, national
    Miscellaneous scientific news/publications
    English


     

    Bridge works, Fechingen Viaduct


    For download

    x

    Help

    Search / advanced search of the idw archives
    Combination of search terms

    You can combine search terms with and, or and/or not, e.g. Philo not logy.

    Brackets

    You can use brackets to separate combinations from each other, e.g. (Philo not logy) or (Psycho and logy).

    Phrases

    Coherent groups of words will be located as complete phrases if you put them into quotation marks, e.g. “Federal Republic of Germany”.

    Selection criteria

    You can also use the advanced search without entering search terms. It will then follow the criteria you have selected (e.g. country or subject area).

    If you have not selected any criteria in a given category, the entire category will be searched (e.g. all subject areas or all countries).